ALICE vs Asta Powerproject
ALICE
alicetechnologies.comAsta Powerproject
elecosoft.comSide by side
| Figure | ALICE | Asta Powerproject |
|---|---|---|
| Price from | — | £57.92/mo |
| Free plan | — | — |
| Free trial | — | — |
| Open source | — | — |
| Web | Yes | Yes |
| Windows | — | Yes |
| macOS | — | Yes |
| iOS | — | Yes |
| Android | — | Yes |
| Plans published | 1 | 5 |
| Spec score · Construction Scheduling Software | 7.6 (#15) | 8.1 (#9) |
| Purpose | ALICE is an AI-powered construction optioneering platform for creating, exploring, and updating schedules to reduce project risk, cost, and build time. | Asta Powerproject is construction planning software for projects ranging from single-storey extensions to megaprojects. |
| Security | ALICE states that data is encrypted in transit with TLS 1.2+ and at rest with AES-256, and that customers own submitted and generated data. | Project access can be controlled with security groups, users, access rights, and passwords; the help documentation warns that projects without a password may be accessible to anyone who knows a user's name. |
Plans
Asta Powerproject
- Single user subscription£695 a year
- Concurrent licencePriced on request
- EnterprisePriced on request
- SaaS licencePriced on request
- Single education licencePriced on request
In their own words
Asta Powerproject
Asta Powerproject is construction planning software for projects from small extensions to megaprojects. It builds Gantt schedules from task pools and code libraries, links tasks for critical-path analysis, and lets planners assign calendars, resources, and costs. Multiple what-if scenarios help compare construction methods or explore ways to accelerate delivery. Cost modelling tracks budgeted, planned, and actual figures over time, while resource planning covers people, plant, and materials. Built-in risk analysis assesses possible delays and cost overruns; Schedule Quality Check can apply custom parameters or DCMA and CIOB metrics. The software works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools. The standard installed client runs only on Microsoft Windows, while hosted SaaS is accessible on Windows and macOS with an internet connection, but lacks some features such as macros and the Developers' Toolkit. The single-user subscription costs £695 per annum, excluding VAT.