Skip to content
SPECIFICTION
Get listed

ALICE vs Open Planner Studio

ALICE

alicetechnologies.com

Open Planner Studio

open-aec.com

Side by side

FigureALICEOpen Planner Studio
Price from—Free
Free plan—Yes
Free trial——
Open source——
WebYesYes
Windows—Yes
macOS—Yes
Linux—Yes
Plans published12
Spec score · Construction Scheduling Software7.6 (#15)7.8 (#12)
HeadquartersMenlo Park, California, United StatesDordrecht, Netherlands
PurposeALICE is an AI-powered construction optioneering platform for creating, exploring, and updating schedules to reduce project risk, cost, and build time.Open Planner Studio is an open source construction planning tool for buildings, infrastructure and civil works.

Plans

ALICE

  • ALICEPriced on request

ALICE pricing →

Open Planner Studio

  • Free and open sourceFree
  • Open Planner StudioFree

Open Planner Studio pricing →

In their own words

ALICE

ALICE has no write-up on Specifiction yet; its figures are above.

Visit alicetechnologies.com

Open Planner Studio

Open Planner Studio is an open-source construction planning tool for buildings, infrastructure and civil works. It provides Gantt charts, automatic critical-path calculation, resource histograms and automatic levelling when resources are overallocated. Schedules use native IFC 4.3; the app imports and exports IFC, CSV, MS Project XML and Primavera P6 XML, and opens MS Project MPP files. Construction calendars can account for holidays, recesses, frost delays, inspections and phasing, with task durations entered in days or hours. Reports export as PDFs at approximately 220 DPI, on paper sizes up to A2, with baseline overlays and status or progress lines. A built-in MCP server allows compatible AI clients to read and edit schedules, with pause, read-only mode, backups and an activity panel. Schedules are stored as IFC files rather than a proprietary closed format. Crash recovery is available, alongside optional periodic saving to a writable project file. The app is marked Available Beta and includes an offline manual in fourteen languages. It runs on Linux, macOS, Windows and the web.

Visit open-aec.com