Skip to content
SPECIFICTION
Get listed

Asta Powerproject vs FastTrack Schedule

Asta Powerproject

elecosoft.com

FastTrack Schedule

aecsoftware.com

Side by side

FigureAsta PowerprojectFastTrack Schedule
Price from£57.92/mo—
Free plan——
Free trial—Yes
Open source——
WebYes—
WindowsYesYes
macOSYesYes
iOSYes—
AndroidYes—
Plans published53
Spec score · Gantt Chart Software8.2 (#15)8.4 (#8)
Spec score · Project Planning Software8.1 (#18)8.4 (#12)
IntegrationsAsta Powerproject works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools.The Windows version imports and exports Microsoft Project XML, Excel, CSV, and tab-delimited files, and imports .ics calendar files.
PurposeAsta Powerproject is construction planning software for projects ranging from single-storey extensions to megaprojects.FastTrack Schedule is project management software for planning, tracking, and reporting projects.
SchedulingUsers can build schedules in a Gantt chart using task pools and code libraries, link tasks for critical-path analysis, and assign calendars, resources, and costs.Effort-driven scheduling adjusts durations based on resource assignments, and critical path tools identify tasks that determine the project end date.
SecurityProject access can be controlled with security groups, users, access rights, and passwords; the help documentation warns that projects without a password may be accessible to anyone who knows a user's name.The store states that checkout transactions use 256-bit SSL encryption.
SupportSupported customers can access an online portal with a knowledgebase, current-version downloads, an add-on library, and product information; the maker also offers technical support, training, webinars, and implementation services.All AEC Software products include Standard Technical Support for the life of the product version, with email, phone, and web form or ticket access; phone support requires a valid License ID and is available within 30 days of purchase.

Plans

Asta Powerproject

  • Single user subscription£695 a year
  • Concurrent licencePriced on request
  • EnterprisePriced on request
  • SaaS licencePriced on request
  • Single education licencePriced on request

Asta Powerproject pricing →

FastTrack Schedule

  • Assigned Seats$2,145, paid once
  • Floating Seats$2,395, paid once
  • FastTrack Schedule 2026Price not published

FastTrack Schedule pricing →

In their own words

Asta Powerproject

Asta Powerproject is construction planning software for projects from small extensions to megaprojects. It builds Gantt schedules from task pools and code libraries, links tasks for critical-path analysis, and lets planners assign calendars, resources, and costs. Multiple what-if scenarios help compare construction methods or explore ways to accelerate delivery. Cost modelling tracks budgeted, planned, and actual figures over time, while resource planning covers people, plant, and materials. Built-in risk analysis assesses possible delays and cost overruns; Schedule Quality Check can apply custom parameters or DCMA and CIOB metrics. The software works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools. The standard installed client runs only on Microsoft Windows, while hosted SaaS is accessible on Windows and macOS with an internet connection, but lacks some features such as macros and the Developers' Toolkit. The single-user subscription costs £695 per annum, excluding VAT.

Visit elecosoft.com

FastTrack Schedule

FastTrack Schedule has no write-up on Specifiction yet; its figures are above.

Visit aecsoftware.com