Skip to content
SPECIFICTION
Get listed

Asta Powerproject vs FinitePath

Asta Powerproject

elecosoft.com

FinitePath

finitepath.com

Side by side

FigureAsta PowerprojectFinitePath
Price from£57.92/mo—
Free plan——
Free trial——
Open source——
WebYesYes
WindowsYes—
macOSYes—
iOSYes—
AndroidYes—
Plans published50
Spec score · Construction Scheduling Software8.1 (#9)7.5 (#16)
CompanyElecosoft says it was founded in 1895 and operates centres of excellence in the UK, Sweden, Germany, the Netherlands, and the USA.The maker identifies itself as FinitePath AI Corporation, a Delaware corporation with operations in Fremont, California, and Hyderabad, India.
PurposeAsta Powerproject is construction planning software for projects ranging from single-storey extensions to megaprojects.FinitePath turns static CPM schedule files into a working model for planning, cost mapping, schedule compression, and client reporting.
SecurityProject access can be controlled with security groups, users, access rights, and passwords; the help documentation warns that projects without a password may be accessible to anyone who knows a user's name.FinitePath says it uses encryption in transit, access controls, and multi-tenant data isolation to protect information.
SupportSupported customers can access an online portal with a knowledgebase, current-version downloads, an add-on library, and product information; the maker also offers technical support, training, webinars, and implementation services.FinitePath lists [email protected] as its contact and says it replies within one business day.

Plans

Asta Powerproject

  • Single user subscription£695 a year
  • Concurrent licencePriced on request
  • EnterprisePriced on request
  • SaaS licencePriced on request
  • Single education licencePriced on request

Asta Powerproject pricing →

FinitePath

No plans published.

FinitePath pricing →

In their own words

Asta Powerproject

Asta Powerproject is construction planning software for projects from small extensions to megaprojects. It builds Gantt schedules from task pools and code libraries, links tasks for critical-path analysis, and lets planners assign calendars, resources, and costs. Multiple what-if scenarios help compare construction methods or explore ways to accelerate delivery. Cost modelling tracks budgeted, planned, and actual figures over time, while resource planning covers people, plant, and materials. Built-in risk analysis assesses possible delays and cost overruns; Schedule Quality Check can apply custom parameters or DCMA and CIOB metrics. The software works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools. The standard installed client runs only on Microsoft Windows, while hosted SaaS is accessible on Windows and macOS with an internet connection, but lacks some features such as macros and the Developers' Toolkit. The single-user subscription costs £695 per annum, excluding VAT.

Visit elecosoft.com

FinitePath

FinitePath is a web platform that turns schedule files into working models for planning, cost mapping, delay analysis, and reporting. It imports Primavera P6 XER or XML, Microsoft Project XML, and Excel BOQs, then exports XER, XML, or JSON. BOQ line items can be mapped to schedule activities so cost and time share one model. Each save recalculates forward and backward passes and checks critical paths, float bands, dangling ends, loops, and redundant links. Delay tools provide calendar-accurate window analysis, baseline snapshots, delay quantification, and claims packs. Resource features include crew utilisation, overload alerts, auto-levelling within float with a project-manager override, and time-phased histograms. Users can compare what-if variants without automatically changing the baseline. Executive reports include schedule health, paths, float, supported earned-value measures, and recovery estimates; missing or implausible data may produce a diagnostic. A no-login PERT Builder is labeled free. AI features may send project data to Anthropic.

Visit finitepath.com