Skip to content
SPECIFICTION
Get listed

Asta Powerproject vs Open Planner Studio

Asta Powerproject

elecosoft.com

Open Planner Studio

open-aec.com

Side by side

FigureAsta PowerprojectOpen Planner Studio
Price from£57.92/moFree
Free plan—Yes
Free trial——
Open source——
WebYesYes
WindowsYesYes
macOSYesYes
Linux—Yes
iOSYes—
AndroidYes—
Plans published52
Spec score · Gantt Chart Software8.2 (#15)7.7 (#30)
Spec score · Construction Scheduling Software8.1 (#9)7.8 (#11)
PurposeAsta Powerproject is construction planning software for projects ranging from single-storey extensions to megaprojects.Open Planner Studio is an open source construction planning tool for buildings, infrastructure and civil works.
SchedulingUsers can build schedules in a Gantt chart using task pools and code libraries, link tasks for critical-path analysis, and assign calendars, resources, and costs.It provides Gantt charts, automatic critical path calculation, resource histograms and automatic levelling of overallocation.
SupportSupported customers can access an online portal with a knowledgebase, current-version downloads, an add-on library, and product information; the maker also offers technical support, training, webinars, and implementation services.The app includes an offline manual in fourteen languages, with a quick start, practical guides, reference pages and sample projects.

Plans

Asta Powerproject

  • Single user subscription£695 a year
  • Concurrent licencePriced on request
  • EnterprisePriced on request
  • SaaS licencePriced on request
  • Single education licencePriced on request

Asta Powerproject pricing →

Open Planner Studio

  • Free and open sourceFree
  • Open Planner StudioFree

Open Planner Studio pricing →

In their own words

Asta Powerproject

Asta Powerproject is construction planning software for projects from small extensions to megaprojects. It builds Gantt schedules from task pools and code libraries, links tasks for critical-path analysis, and lets planners assign calendars, resources, and costs. Multiple what-if scenarios help compare construction methods or explore ways to accelerate delivery. Cost modelling tracks budgeted, planned, and actual figures over time, while resource planning covers people, plant, and materials. Built-in risk analysis assesses possible delays and cost overruns; Schedule Quality Check can apply custom parameters or DCMA and CIOB metrics. The software works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools. The standard installed client runs only on Microsoft Windows, while hosted SaaS is accessible on Windows and macOS with an internet connection, but lacks some features such as macros and the Developers' Toolkit. The single-user subscription costs £695 per annum, excluding VAT.

Visit elecosoft.com

Open Planner Studio

Open Planner Studio is an open-source construction planning tool for buildings, infrastructure and civil works. It provides Gantt charts, automatic critical-path calculation, resource histograms and automatic levelling when resources are overallocated. Schedules use native IFC 4.3; the app imports and exports IFC, CSV, MS Project XML and Primavera P6 XML, and opens MS Project MPP files. Construction calendars can account for holidays, recesses, frost delays, inspections and phasing, with task durations entered in days or hours. Reports export as PDFs at approximately 220 DPI, on paper sizes up to A2, with baseline overlays and status or progress lines. A built-in MCP server allows compatible AI clients to read and edit schedules, with pause, read-only mode, backups and an activity panel. Schedules are stored as IFC files rather than a proprietary closed format. Crash recovery is available, alongside optional periodic saving to a writable project file. The app is marked Available Beta and includes an offline manual in fourteen languages. It runs on Linux, macOS, Windows and the web.

Visit open-aec.com