Construction Scheduler 365 vs Open Planner Studio
Construction Scheduler 365
constructionscheduler365.comOpen Planner Studio
open-aec.comSide by side
| Figure | Construction Scheduler 365 | Open Planner Studio |
|---|---|---|
| Price from | £25/mo | Free |
| Free plan | — | Yes |
| Free trial | Yes | — |
| Open source | — | — |
| Web | Yes | Yes |
| Windows | — | Yes |
| macOS | — | Yes |
| Linux | — | Yes |
| Plans published | 3 | 2 |
| Spec score · Construction Scheduling Software | 7.8 (#10) | 7.8 (#11) |
| Purpose | The product is AI construction scheduling software for UK builders to plan subcontractors, track snagging and inspections, and send schedules to clients. | Open Planner Studio is an open source construction planning tool for buildings, infrastructure and civil works. |
| Scheduling | The scheduler includes drag-and-drop subcontractor bookings, 7- and 14-day calendar views, and conflict detection. | It provides Gantt charts, automatic critical path calculation, resource histograms and automatic levelling of overallocation. |
| Support | The Starter plan includes email support, Pro includes priority support, and Team includes a dedicated success manager. | The app includes an offline manual in fourteen languages, with a quick start, practical guides, reference pages and sample projects. |
Plans
Construction Scheduler 365
- Starter£25 a month
- Pro£49 a month
- Team£89 a month
In their own words
Construction Scheduler 365
Construction Scheduler 365 has no write-up on Specifiction yet; its figures are above.
Open Planner Studio
Open Planner Studio is an open-source construction planning tool for buildings, infrastructure and civil works. It provides Gantt charts, automatic critical-path calculation, resource histograms and automatic levelling when resources are overallocated. Schedules use native IFC 4.3; the app imports and exports IFC, CSV, MS Project XML and Primavera P6 XML, and opens MS Project MPP files. Construction calendars can account for holidays, recesses, frost delays, inspections and phasing, with task durations entered in days or hours. Reports export as PDFs at approximately 220 DPI, on paper sizes up to A2, with baseline overlays and status or progress lines. A built-in MCP server allows compatible AI clients to read and edit schedules, with pause, read-only mode, backups and an activity panel. Schedules are stored as IFC files rather than a proprietary closed format. Crash recovery is available, alongside optional periodic saving to a writable project file. The app is marked Available Beta and includes an offline manual in fourteen languages. It runs on Linux, macOS, Windows and the web.