Seiki Advanced Planning and Scheduling, also called Seiki Scheduler, builds manufacturing production plans around actual capacity to balance delivery dates and workload. It schedules operations against available resources and supports real-time adjustments. An interactive graphical planning board summarizes active order loading and operation details, while built-in sequencing rules provide a baseline that planners can refine. Users can model schedule changes and compare saved snapshots before choosing a plan; running scenarios and saving snapshots for evaluation requires the optional Simulation license. Seiki EAI connects the scheduler to ERP, MRP, PLM, and other databases, with one-way or bidirectional transfer. SQL views and CSV files are described as import methods. The Scheduler can also operate without ERP, using manually entered works orders and routing templates. It supports finite-capacity scheduling, machine and labor capacity planning, and material constraints. Seiki says it can handle tens of thousands of operations, though saving changes takes longer as the database grows. It is licensed per resource, with no stated cap on resource count. Seiki AIR runs in a browser and supports self-hosted web server or Microsoft IIS deployment; Windows is also listed. Pricing is available on request.

Spec sheet

Purpose
Seiki Scheduler creates production plans using actual capacity to help manufacturers improve on-time delivery, respond to changes and utilise production resources.Read 9 Oct 2026 · seikisystems.co.uk
Security
Seiki says each Seiki AIR release includes current security protocols and patches, with authentication procedures intended to prevent unauthorised access.Read 9 Oct 2026 · seikisystems.co.uk
Headquarters
Brighton, United KingdomRead 28 Sep 2026 · seikisystems.co.uk
Founded
1992Read 28 Sep 2026 · seikisystems.co.uk
Capacity
Seiki says the Scheduler can handle tens of thousands of operations and describes a schedule containing over thirty thousand operations.Read 8 Oct 2026 · seikisystems.co.uk
Company history
A Seiki company brochure says Seiki Systems was established in 1992 and specialises in manufacturing execution systems.Read 9 Oct 2026 · seikisystems.co.uk
Company history and HQ
Seiki says it started in 1992 and lists its address as Olivier House, 18 Marine Parade, Brighton BN2 1TL.Read 8 Oct 2026 · seikisystems.co.uk
Concurrency limit
The FAQ says a customer typically has one active master scheduler; an optional Simulation license lets other users run scenarios and save snapshots for review.Read 9 Oct 2026 · seikisystems.co.uk
Data exchange
The EAI page describes SQL views and CSV files as methods for importing data into the Scheduler database.Read 8 Oct 2026 · seikisystems.co.uk
ERP and database integration
Seiki EAI interfaces with ERP, MRP or PLM systems and other industry-standard databases such as Microsoft SQL, and supports bi-directional data transfer.Read 9 Oct 2026 · seikisystems.co.uk
ERP and MRP integration
Seiki EAI connects the scheduler to ERP, MRP, PLM, or other databases, with data transfer that can be one-way or bidirectional.Read 8 Oct 2026 · seikisystems.co.uk
Finite capacity
The scheduler accounts for available resource capacity and only schedules operations when resources are available.Read 9 Oct 2026 · seikisystems.co.uk
Implementation and support
Seiki describes its service as including planning, installation, implementation, customisation, training, and after-sales support.Read 8 Oct 2026 · seikisystems.co.uk
Installation
Seiki estimates a standard Scheduler installation can take as little as a week, with additional project time for third-party interfaces.Read 9 Oct 2026 · seikisystems.co.uk
License limits
The Scheduler is licensed per resource, and Seiki states there is no limit to the number of resources that can be added.Read 8 Oct 2026 · seikisystems.co.uk
Optional capability
An optional Simulation license lets users run planning scenarios and save snapshots for evaluation by the master scheduler.Read 8 Oct 2026 · seikisystems.co.uk
Planning board
Interactive graphical planning views show the loading of active orders and production information for individual operations.Read 9 Oct 2026 · seikisystems.co.uk
Platform
Seiki AIR is browser-based, runs on almost any device with a browser, and supports a self-hosted web server or Microsoft IIS.Read 9 Oct 2026 · seikisystems.co.uk
Prerequisites
Before installation, users need works orders and routings for discrete manufacturing operations; standalone users enter this information manually.Read 8 Oct 2026 · seikisystems.co.uk
Scale
The Scheduler can handle tens of thousands of operations, though saving changes takes longer as the database grows.Read 9 Oct 2026 · seikisystems.co.uk
Scenario analysis
Users can create what-if scenarios and compare saved schedule snapshots before applying a preferred plan.Read 8 Oct 2026 · seikisystems.co.uk
Scheduling rules
Built-in sequencing rules can be compared in scenarios before applying a selected rule to the live schedule.Read 9 Oct 2026 · seikisystems.co.uk
Standalone use
The Scheduler can be used without an ERP system, with works orders, operations and routing templates entered directly in the software.Read 9 Oct 2026 · seikisystems.co.uk
Support and updates
Customers with a current maintenance contract are entitled to the latest software release and can request it from Seiki Support.Read 9 Oct 2026 · seikisystems.co.uk
What-if scenarios
Users can model schedule changes and review their impact before committing to a plan.Read 9 Oct 2026 · seikisystems.co.uk

Plans and prices

Seiki Advanced Planning and Scheduling (Seiki Scheduler) Priced on request Licensed per resource · No limit to the number of resources you can add Read 9 Oct 2026 · seikisystems.co.uk
Seiki Scheduler Priced on request licensed per resource · no limit to resources stated Read 8 Oct 2026 · seikisystems.co.uk

Every Seiki Advanced Planning and Scheduling plan and price →

Strong points and limits

Strong points

  • Finite-capacity production scheduling
  • Machine, labor, and material planning
  • Scenario comparison before committing changes
  • One-way or bidirectional ERP and database transfer
  • No stated limit on added resources

Limits

  • Pricing is available on request
  • Scenario runs and saved snapshots require an optional license
  • Standalone users must enter works orders and routings
  • Saving changes takes longer as the database grows

Who it suits

It suits manufacturers planning production against resource capacity, delivery dates, and workload. It may also fit teams that need ERP or database connections, or that prefer to enter works orders and routings without ERP.

Verdict

Seiki Scheduler provides capacity-based planning with integration routes and a standalone option. Buyers should account for its per-resource licensing and the optional Simulation license for scenario work.