Asprova APS vs Seiki Advanced Planning and Scheduling
Asprova APS
asprova.comSeiki Advanced Planning and Scheduling
seikisystems.co.ukSide by side
| Figure | Asprova APS | Seiki Advanced Planning and Scheduling |
|---|---|---|
| Price from | — | — |
| Free plan | — | — |
| Free trial | Yes | — |
| Open source | — | — |
| Web | — | Yes |
| Windows | Yes | Yes |
| Self-hosted | Yes | Yes |
| Plans published | 1 | 2 |
| Spec score · Manufacturing Scheduling Software | 7.9 (#10) | 7.6 (#18) |
| Founded | 1994 | 1992 |
| Headquarters | Tokyo, Japan | Brighton, United Kingdom |
| Purpose | Asprova APS creates production schedules for multiple items and processes, integrating sales, manufacturing, inventory and purchase plans. | Seiki Scheduler creates production plans using actual capacity to help manufacturers improve on-time delivery, respond to changes and utilise production resources. |
Plans
Seiki Advanced Planning and Scheduling
- Seiki Advanced Planning and Scheduling (Seiki Scheduler)Priced on request
- Seiki SchedulerPriced on request
In their own words
Asprova APS
Asprova APS creates production schedules for factories and manufacturers, integrating sales, manufacturing, inventory, and purchasing plans across multiple items and processes. Its synchronized planning and capacity tools use standard times down to the second and can account for individual machines, molds, and personnel. Planners can create multiple scenarios, adjust parts of an existing plan manually, and reschedule. Charts and graphs show line overloads, delivery delays, and load differences by day, week, or month. Asprova connects to relational database tables and CSV files; users can configure mappings and differential imports and exports. The maker says it can integrate with most ERP, production management, MES, shop floor control, and legacy systems. Optional modules include Sales, Purchasing, KPI, Time Constraint MAX, Resource Lock, Event, and Optimization. The product is paid, with pricing on request; implementation, training, consultation, and integration may add costs. A trial edition can be used with e-learning exercises, but no trial duration is stated. It is self-hosted Windows software. The maker says a maintenance contract is required to upgrade Asprova.
Seiki Advanced Planning and Scheduling
Seiki Advanced Planning and Scheduling, also called Seiki Scheduler, builds manufacturing production plans around actual capacity to balance delivery dates and workload. It schedules operations against available resources and supports real-time adjustments. An interactive graphical planning board summarizes active order loading and operation details, while built-in sequencing rules provide a baseline that planners can refine. Users can model schedule changes and compare saved snapshots before choosing a plan; running scenarios and saving snapshots for evaluation requires the optional Simulation license. Seiki EAI connects the scheduler to ERP, MRP, PLM, and other databases, with one-way or bidirectional transfer. SQL views and CSV files are described as import methods. The Scheduler can also operate without ERP, using manually entered works orders and routing templates. It supports finite-capacity scheduling, machine and labor capacity planning, and material constraints. Seiki says it can handle tens of thousands of operations, though saving changes takes longer as the database grows. It is licensed per resource, with no stated cap on resource count. Seiki AIR runs in a browser and supports self-hosted web server or Microsoft IIS deployment; Windows is also listed. Pricing is available on request.