Skip to content
SPECIFICTION
Get listed

Asta Powerproject vs Rillsoft Project

Asta Powerproject

elecosoft.com

Rillsoft Project

rillsoft.com

Side by side

FigureAsta PowerprojectRillsoft Project
Price from£57.92/mo€60/mo
Free plan——
Free trial—Yes
Open source——
WebYesYes
WindowsYesYes
macOSYes—
Linux—Yes
iOSYes—
AndroidYesYes
API—Yes
Self-hosted—Yes
Plans published539
Spec score · Gantt Chart Software8.2 (#15)8.6 (#6)
IntegrationsAsta Powerproject works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools.Rillsoft Project supports MS Project import and export via XML and MS Excel import and export via CSV.
PurposeAsta Powerproject is construction planning software for projects ranging from single-storey extensions to megaprojects.Rillsoft Project supports project planning, scheduling, resource planning, capacity planning, multi-project planning and project controlling.
SchedulingUsers can build schedules in a Gantt chart using task pools and code libraries, link tasks for critical-path analysis, and assign calendars, resources, and costs.It provides Gantt charts, task dependencies, automatic scheduling, critical path analysis and buffer times.
SecurityProject access can be controlled with security groups, users, access rights, and passwords; the help documentation warns that projects without a password may be accessible to anyone who knows a user's name.The Integration Server provides role-based access rights, logs accesses and changes, and archives project versions with timestamps and user IDs.
SupportSupported customers can access an online portal with a knowledgebase, current-version downloads, an add-on library, and product information; the maker also offers technical support, training, webinars, and implementation services.A software service agreement includes feature updates, program corrections, and support by phone, remote access and email; annual cost is 15% of list license cost with a €300 minimum.

Plans

Asta Powerproject

  • Single user subscription£695 a year
  • Concurrent licencePriced on request
  • EnterprisePriced on request
  • SaaS licencePriced on request
  • Single education licencePriced on request

Asta Powerproject pricing →

Rillsoft Project

  • Light — single-user license€357, paid once
  • Light — single-user license€357 a month
  • Standard — single-user license€579 a month
  • Standard — single-user license€579, paid once
  • Professional — single-user license€899 a month
  • Professional — single-user license€899, paid once
  • Enterprise — single-user license€1,399, paid once
  • Enterprise — single-user license€1,399 a month
  • Light — floating license€413 a month
  • Light — floating license€413, paid once

Rillsoft Project pricing →

In their own words

Asta Powerproject

Asta Powerproject is construction planning software for projects from small extensions to megaprojects. It builds Gantt schedules from task pools and code libraries, links tasks for critical-path analysis, and lets planners assign calendars, resources, and costs. Multiple what-if scenarios help compare construction methods or explore ways to accelerate delivery. Cost modelling tracks budgeted, planned, and actual figures over time, while resource planning covers people, plant, and materials. Built-in risk analysis assesses possible delays and cost overruns; Schedule Quality Check can apply custom parameters or DCMA and CIOB metrics. The software works with Microsoft Project and Oracle Primavera files and integrates with Bidcon estimating applications, ERP systems, and BIM tools. The standard installed client runs only on Microsoft Windows, while hosted SaaS is accessible on Windows and macOS with an internet connection, but lacks some features such as macros and the Developers' Toolkit. The single-user subscription costs £695 per annum, excluding VAT.

Visit elecosoft.com

Rillsoft Project

Rillsoft Project supports project planning, scheduling, resource and capacity planning, multi-project planning, and project controlling. Scheduling tools include Gantt charts, task dependencies, automatic scheduling, critical path analysis, and buffer times. A shared resource pool tracks capacity, qualifications, working times, and availability across parallel projects; capacity analysis can flag demand and bottlenecks before specific employees are assigned. Project controlling compares progress, schedules, effort, and costs with reference plans to identify variances. The software imports and exports MS Project data through XML and Excel data through CSV. It is a Windows desktop client that can work with local project files, an on-premise Integration Server, or Rillsoft Cloud. A full-function trial lasts 30 days; afterward, projects can be read but not created or edited. Freeware is limited to private, non-commercial use, while Reader can view but not edit saved projects. Single-user licenses are listed from €357 a month, plus applicable VAT.

Visit rillsoft.com