MangoGem APS Optimizer vs Seiki Advanced Planning and Scheduling
MangoGem APS Optimizer
mangogem.comSeiki Advanced Planning and Scheduling
seikisystems.co.ukSide by side
| Figure | MangoGem APS Optimizer | Seiki Advanced Planning and Scheduling |
|---|---|---|
| Price from | — | — |
| Free plan | — | — |
| Free trial | — | — |
| Open source | — | — |
| Web | Yes | Yes |
| Windows | — | Yes |
| Self-hosted | Yes | Yes |
| Plans published | 1 | 2 |
| Spec score · Manufacturing Scheduling Software | 7.8 (#11) | 7.6 (#18) |
| Founded | 2002 | 1992 |
| Headquarters | Waterloo, Belgium | Brighton, United Kingdom |
| Purpose | MangoGem APS Optimizer is a finite-capacity scheduler for production planning and scheduling. | Seiki Scheduler creates production plans using actual capacity to help manufacturers improve on-time delivery, respond to changes and utilise production resources. |
| Scale | The optimizer can handle cases with dozens of resources and hundreds or thousands of activities. | The Scheduler can handle tens of thousands of operations, though saving changes takes longer as the database grows. |
Plans
Seiki Advanced Planning and Scheduling
- Seiki Advanced Planning and Scheduling (Seiki Scheduler)Priced on request
- Seiki SchedulerPriced on request
In their own words
MangoGem APS Optimizer
MangoGem APS Optimizer is a finite-capacity scheduler for enterprise production planning and supply-chain operations. It combines planning and scheduling in one model, handling sequence setups, cleaning-in-process, tank planning, batching, multi-level bills of materials, and order pegging. Tank planning covers capacity constraints, partial fills, batch splits, coupled resources, blending, flushing, and cleaning in place. The optimizer can target up to five KPIs at once from more than 50 built-in options, using methods including sequencing, heuristic search, genetic algorithms, and machine learning. Teams can compare objectives through what-if scenarios and multi-objective scheduling. MangoGem says the system can handle dozens of resources and hundreds or thousands of activities, with offline, online, and real-time use. It supports machine, labor, and material constraints, multi-site scheduling, collaboration, and configurable access rights. Deployment is available on-premises or in the cloud, as self-hosted software or through the web. The maker says it integrates with ERP systems such as SAP and Microsoft Dynamics NAV, as well as MES and sensor data. Pricing is on request.
Seiki Advanced Planning and Scheduling
Seiki Advanced Planning and Scheduling, also called Seiki Scheduler, builds manufacturing production plans around actual capacity to balance delivery dates and workload. It schedules operations against available resources and supports real-time adjustments. An interactive graphical planning board summarizes active order loading and operation details, while built-in sequencing rules provide a baseline that planners can refine. Users can model schedule changes and compare saved snapshots before choosing a plan; running scenarios and saving snapshots for evaluation requires the optional Simulation license. Seiki EAI connects the scheduler to ERP, MRP, PLM, and other databases, with one-way or bidirectional transfer. SQL views and CSV files are described as import methods. The Scheduler can also operate without ERP, using manually entered works orders and routing templates. It supports finite-capacity scheduling, machine and labor capacity planning, and material constraints. Seiki says it can handle tens of thousands of operations, though saving changes takes longer as the database grows. It is licensed per resource, with no stated cap on resource count. Seiki AIR runs in a browser and supports self-hosted web server or Microsoft IIS deployment; Windows is also listed. Pricing is available on request.