Skip to content
SPECIFICTION
Get listed

Oracle Primavera Cloud vs Rillsoft Project

Oracle Primavera Cloud

oracle.com

Rillsoft Project

rillsoft.com

Side by side

FigureOracle Primavera CloudRillsoft Project
Price from$12/mo€60/mo
Free plan——
Free trial—Yes
Open source——
WebYesYes
Windows—Yes
Linux—Yes
iOSYes—
AndroidYesYes
APIYesYes
Self-hosted—Yes
Plans published739
Spec score · Project Portfolio Management Software8.5 (#7)8.7 (#4)
Spec score · Project management tools8.7 (#48)8.9 (#35)
Spec score · Gantt Chart Software8.3 (#14)8.6 (#6)
Spec score · Project Management Software8.4 (#76)8.7 (#44)
APIA REST API exposes Primavera Cloud functionality and data for integrations and automation.The official Integration Server API exposes projects, tasks, employees, workloads, vacations, documents and dashboards over HTTPS as JSON with an OpenAPI specification.
API versionsAPI version 3 is available and recommended, with version selection controlled by a Version header.API v2 is the current REST interface introduced with Project 10, while v1 is maintained for the Android app and existing integrations.
HeadquartersAustin, Texas, USARillsoft GmbH lists its postal address in Leonberg, Germany.
IntegrationsDirect integrations and Primavera Gateway synchronize P6 or Microsoft Project data, while Oracle Integration provides adapters for Oracle, Primavera Cloud and third-party systems.Rillsoft Project supports MS Project import and export via XML and MS Excel import and export via CSV.
Intended usersOracle describes the service for engineering and construction projects of any size and for owners, schedulers, and delivery teams.Rillsoft describes the product as suitable for mid-sized industrial companies, engineering offices, technical and IT service providers, manufacturing teams and PMO organizations.
PurposeOracle Primavera Cloud connects owners and delivery teams for shared project planning, scheduling, resource management, and risk management.Rillsoft Project supports project planning, scheduling, resource planning, capacity planning, multi-project planning and project controlling.
Rating on G24.4 out of 5 from 391 reviews4.0 out of 5 from 1 reviews
Rating on GetApp4.4 out of 5 from 182 reviews0 out of 5 from 0 reviews
SchedulingThe service supports contract planning and scheduling and connects contract schedules with field schedules in a unified plan.It provides Gantt charts, task dependencies, automatic scheduling, critical path analysis and buffer times.
SupportMy Oracle Support provides 24/7 access to support specialists and training.A software service agreement includes feature updates, program corrections, and support by phone, remote access and email; annual cost is 15% of list license cost with a €300 minimum.
System requirementsThe September 2026 matrix supports Windows 11 64-bit, macOS 15 or 26, Chrome or Edge 153+, Firefox ESR 140+, Android 14+ and iOS 18+.Desktop installation is supported on Windows 10, Windows 11 and corresponding Windows Server versions.
What it doesOracle Primavera Cloud connects owners and delivery teams for shared project planning, scheduling, resource management and risk management.Rillsoft Project is specialized software for multi-project resource planning, capacity planning, scheduling and project controlling for mid-sized industrial organizations.

Plans

Oracle Primavera Cloud

  • Oracle Primavera Progress Cloud Service$12 a month
  • Oracle Primavera Task Management Cloud Service$55 a month
  • Oracle Primavera Cloud – Task Management$60 a month
  • Oracle Primavera Schedule Cloud Service$120 a month
  • Oracle Primavera Cloud – Schedule$130 a month
  • Oracle Primavera Portfolio and Capital Planning Cloud Service$220 a month
  • Oracle Primavera Cloud – Portfolio and Capital Planning$235 a month

Oracle Primavera Cloud pricing →

Rillsoft Project

  • Light — single-user license€357, paid once
  • Light — single-user license€357 a month
  • Standard — single-user license€579 a month
  • Standard — single-user license€579, paid once
  • Professional — single-user license€899 a month
  • Professional — single-user license€899, paid once
  • Enterprise — single-user license€1,399, paid once
  • Enterprise — single-user license€1,399 a month
  • Light — floating license€413 a month
  • Light — floating license€413, paid once

Rillsoft Project pricing →

In their own words

Oracle Primavera Cloud

Oracle Primavera Cloud connects project owners and delivery teams for shared planning, scheduling, resource management, and risk management on engineering and construction work. It links contract schedules with field schedules, while field planning supports short-interval plans, task cards, progress updates, dashboards, and reports. Resource tools draw on a centralized pool of labor, equipment, and materials to plan capacity and demand across projects. Risk management includes a register, qualitative scoring, schedule and cost analysis, response plans, monitoring, and reporting. Portfolio and capital planning help owners evaluate and prioritize projects against organizational goals. The service can exchange XER files with Primavera P6 and documents imports from P6 XML or XER, Microsoft Project MSP XML, and Excel XLSX. Integrations include P6, Microsoft Project, Primavera Gateway, Oracle Integration adapters, and a REST API; some integrations can take up to 14 days to set up. It runs on Android, iOS, web, and API. Mobile apps require iOS 18 or higher or Android 14 or higher. Monthly service prices range from $12 a month for Progress to $220 a month for Portfolio and Capital Planning, each billed per Hosted Named User. Access to functionality depends on license and security privileges.

Visit oracle.com

Rillsoft Project

Rillsoft Project supports project planning, scheduling, resource and capacity planning, multi-project planning, and project controlling. Scheduling tools include Gantt charts, task dependencies, automatic scheduling, critical path analysis, and buffer times. A shared resource pool tracks capacity, qualifications, working times, and availability across parallel projects; capacity analysis can flag demand and bottlenecks before specific employees are assigned. Project controlling compares progress, schedules, effort, and costs with reference plans to identify variances. The software imports and exports MS Project data through XML and Excel data through CSV. It is a Windows desktop client that can work with local project files, an on-premise Integration Server, or Rillsoft Cloud. A full-function trial lasts 30 days; afterward, projects can be read but not created or edited. Freeware is limited to private, non-commercial use, while Reader can view but not edit saved projects. Single-user licenses are listed from €357 a month, plus applicable VAT.

Visit rillsoft.com