Skip to content
SPECIFICTION
Get listed

Seiki Advanced Planning and Scheduling vs Siemens Opcenter

Seiki Advanced Planning and Scheduling

seikisystems.co.uk

Siemens Opcenter

siemens.com

Side by side

FigureSeiki Advanced Planning and SchedulingSiemens Opcenter
Price from——
Free plan——
Free trial—Yes
Open source——
WebYesYes
WindowsYesYes
API—Yes
Self-hostedYesYes
Plans published24
Spec score · Manufacturing Scheduling Software7.6 (#18)8.1 (#8)
Founded19921847
HeadquartersBrighton, United KingdomMunich, Germany
SecuritySeiki says each Seiki AIR release includes current security protocols and patches, with authentication procedures intended to prevent unauthorised access.Siemens says its cloud services use default zero access, with customer administrators granting or removing user access.

Plans

Seiki Advanced Planning and Scheduling

  • Seiki Advanced Planning and Scheduling (Seiki Scheduler)Priced on request
  • Seiki SchedulerPriced on request

Seiki Advanced Planning and Scheduling pricing →

Siemens Opcenter

  • Opcenter X free trialFree
  • Opcenter APSPriced on request
  • Opcenter X EssentialsPriced on request
  • Opcenter X StandardPriced on request

Siemens Opcenter pricing →

In their own words

Seiki Advanced Planning and Scheduling

Seiki Advanced Planning and Scheduling, also called Seiki Scheduler, builds manufacturing production plans around actual capacity to balance delivery dates and workload. It schedules operations against available resources and supports real-time adjustments. An interactive graphical planning board summarizes active order loading and operation details, while built-in sequencing rules provide a baseline that planners can refine. Users can model schedule changes and compare saved snapshots before choosing a plan; running scenarios and saving snapshots for evaluation requires the optional Simulation license. Seiki EAI connects the scheduler to ERP, MRP, PLM, and other databases, with one-way or bidirectional transfer. SQL views and CSV files are described as import methods. The Scheduler can also operate without ERP, using manually entered works orders and routing templates. It supports finite-capacity scheduling, machine and labor capacity planning, and material constraints. Seiki says it can handle tens of thousands of operations, though saving changes takes longer as the database grows. It is licensed per resource, with no stated cap on resource count. Seiki AIR runs in a browser and supports self-hosted web server or Microsoft IIS deployment; Windows is also listed. Pricing is available on request.

Visit seikisystems.co.uk

Siemens Opcenter

Siemens Opcenter is a manufacturing operations management portfolio covering production execution, quality, planning, scheduling and manufacturing intelligence. Its MES products track and enforce production processes to support quality and efficiency. Quality management capabilities help organize processes and resources for customer requirements and compliance with standards and industry guidelines. Planning and scheduling tools are intended to reduce inventory, shorten production cycles and improve customer service levels. Opcenter Intelligence uses manufacturing and enterprise data to show production status and analytics.

Opcenter X is a modular SaaS option designed for small and medium-sized businesses. Essentials includes order management, track and trace, and non-conformance management; Standard adds digital-twin integration, with high availability available as a purchase option. Both plans can be deployed through SaaS, VPC or on-premises. Essentials supports NATS, MQTT, OPC UA, file-system and HTTP interoperability. Siemens lists pricing on request and offers a 30-day free trial of Opcenter X. The wider portfolio also includes factory-layout connections to real-time system data and integration adapters, including bidirectional SAP ERP flows.

Visit siemens.com